The work on the new flooring continued today.
We purchased some matching tile for the bathroom that would be placed up on the wall. However, the drywall behind the toilet looked like it had some water damage so we had to repair it.
Thankfully the mold hadn’t penetrated all of the way through the drywall.
Before mud/tape
After the first coat...
We set up a place to eat lunch downstairs.
No comments:
Post a Comment