Thursday, December 2, 2010

Floor’s Finished!

 

IMG_3031IMG_3038IMG_3033

The work on our new flooring was finished this morning! The house looks so different!

IMG_3026IMG_3025IMG_3028

Hallway Bathroom

 

Monday: The backer board was cut for the entire work area. There was a problem w had to resolve with the installers about sealing the grout, so that stalled progress a bit. Supplies were carried inside and we took out the squeaks in the subfloor.

Tuesday: The backer board was fastened to the subfloor with nails and adhesive. They had set the tile in the living room, kitchen and laundry room.

Wednesday: The tile in the hallway bathroom, the front entry and also the hallway was set. The tile they had set on Tuesday was grouted.

Thursday: They grouted the hallway, bathroom and entry and also installed thresholds for the doorways and stairs. Installed additional small tile in bathroom. Packed up their tools and left before noon.

IMG_3030IMG_3032

Preparing to paint trim

It was a creative challenge to navigate through the house without stepping on mortar or grout that had to dry. While the installers were working in the hallway the 3 of us couldn’t get to our bedrooms, so we had to come up with some creative solutions so we could climb through the windows! Smile  It looks like we’re practicing our fire drills.

.

Noah and I started getting sick yesterday and today we feel a lot worse. I spent the majority of the day in bed.

Tomorrow we’ll be moving in some of the lighter pieces of furniture and laying down the baseboards. We’re hoping that on Saturday we’ll be able to move in the appliances, so we can cook a meal again! We’re going to use the left over tile, mortar and grout to put the same flooring into the back bathroom ourselves. It’s very small, so it shouldn’t be too much work.

 

IMG_3042IMG_3044

Back Bathroom

Ronda started working on the hallway bathroom and the back bathroom.

IMG_3021IMG_3029

Hallway bathroom

In the back bathroom she stripped off the old, peeling paint and repairing the walls with drywall mud. The walls in the hallway bathroom were really messed up too, so she used some joint compound to fix the holes and dents.

Floor’s Finished!

 

IMG_3031IMG_3038IMG_3033

The work on our new flooring was finished this morning! The house looks so different!

IMG_3026IMG_3025IMG_3028

Hallway Bathroom

 

Monday: The backer board was cut for the entire work area. There was a problem w had to resolve with the installers about sealing the grout, so that stalled progress a bit. Supplies were carried inside and we took out the squeaks in the subfloor.

Tuesday: The backer board was fastened to the subfloor with nails and adhesive. They had set the tile in the living room, kitchen and laundry room.

Wednesday: The tile in the hallway bathroom, the front entry and also the hallway was set. The tile they had set on Tuesday was grouted.

Thursday: They grouted the hallway, bathroom and entry and also installed thresholds for the doorways and stairs. Installed additional small tile in bathroom. Packed up their tools and left before noon.

IMG_3030IMG_3032

Preparing to paint trim

It was a creative challenge to navigate through the house without stepping on mortar or grout that had to dry. While the installers were working in the hallway the 3 of us couldn’t get to our bedrooms, so we had to come up with some creative solutions so we could climb through the windows! Smile  It looks like we’re practicing our fire drills.

.

IMG_3100IMG_3098IMG_3101

Noah and I started getting sick yesterday and today we feel a lot worse. I spent the majority of the day in bed.

Tomorrow we’ll be moving in some of the lighter pieces of furniture and laying down the baseboards. We’re hoping that on Saturday we’ll be able to move in the appliances, so we can cook a meal again! We’re going to use the left over tile, mortar and grout to put the same flooring into the back bathroom ourselves. It’s very small, so it shouldn’t be too much work.

 

IMG_3042IMG_3044

Back Bathroom

Ronda started working on the hallway bathroom and the back bathroom.

IMG_3021IMG_3029

Hallway bathroom

In the back bathroom she stripped off the old, peeling paint and repairing the walls with drywall mud. The walls in the hallway bathroom were really messed up too, so she used some joint compound to fix the holes and dents.

Wednesday, December 1, 2010

Floor Almost Finished

The work on the new flooring continued today.

IMG_2941IMG_2938

 

We purchased some matching tile for the bathroom that would be placed up on the wall. However, the drywall behind the toilet looked like it had some water damage so we had to repair it. IMG_2951IMG_2950

 

IMG_2952IMG_2954

Thankfully the mold hadn’t penetrated all of the way through the drywall.IMG_2964IMG_2969

Before mud/tape

 

IMG_2976IMG_2979

After the first coat...

 

IMG_2993IMG_2990IMG_2996IMG_3006 IMG_3008IMG_3011

IMG_2986_thumb2_thumb

IMG_2982_thumb1_thumbIMG_2987_thumb1_thumb

We set up a place to eat lunch downstairs.

Tuesday, November 30, 2010

Groupon

My brothers and I have had the opportunity to have some pretty neat adventures…my Mom has found a way for us to learn new skills and to have some diverse experiences that don’t break the bank. She checks her Groupon app for “Today’s Daily Deal” and can get receive huge discounts for things she knows we’ll like to do. For instance, in a few months we’ll learn how to scuba dive, attend a performance of the Nutcracker and create a photo book from the pictures we took from our Florida trip.

Check it out for yourself-membership is free!

 

Go to Groupon>

dn-logo-area